Serial number |
Name of project |
Construction unit |
Scope in the project where the Company takes part in
|
Start working date/projected completion date
|
|
1 |
Hanna Shihua Continued Construction Project of
8 million ton Refining |
Hanna Shihua Refining & Chemical Co., Ltd.
|
Project scope:①
2 million ton/year refining process plant on adding
hydrogen in diesel Oil,②
300 thousand ton/year refining process plant on
adding hydrogen in aviation kerosene,③60
thousand normal m3/hour hydrogen
production plant,④
Crude oil tank field (6×100 thousand m3,
2×5000 m3),
⑤
fire station and gas control station,⑥
foam station |
From April of 2004 to June of 2006 |
|
2 |
Manming Petrochemical 300 thousand ton/year
polypropylene plant of 800 thousand ton/year Ethane
Rebuilding and Expanding Project |
Sinopec Guangdong Manming Branch |
The plant adopts improved domestically produced
second-generation loop pipe method polypropylene
processing technology. Main project scope: comprised
of 9 work sections and assistant facilities, steel
structure of 2025 tons, concrete placing of 18300
cubic meters, stationary equipment of 181 sets,
mechanical equipment of 103
sets (excluding imported pump, packing machine and
compressor), pipeline of 51 km, distribution
equipment of 180 sets, cable laying of 187 km,
automatic instrument equipment of 292 sets. |
From August of 2004 to March of 2006 |
|
3 |
Yanshan Branch Transformation Project of 10 million
ton Refining System |
Sinopec Guangdong Yanshan Branch |
Project scope:①50
thousand normal m3/hour
hydrogen production plant,②
united plant for combined treatment of three wastes
(solvent reclamation, Wastewater Stripping and
sulfur recovery) |
From December of 2004 to December of 2005
|
|
4 |
Nanjing Yangzi PTA oxidation device |
Sinopec Nanjing
Yangzi Petrochemical Co., Ltd. |
The designed scale of the plant is 450 thousand tons
per year terephthalic acid. Operation hours per year
is 7800 hours, output per hour is 70T/h, the plant
consists of 15 units, stationary equipment totals
249 sets, steel structure amounts to 3328 tons,
pipeline with various materials and processing
amounts to 92760 meters /1584.38 tons |
From February of 2005 to March of 2006 |
|
5 |
Huangdao oil depot project |
Huangdao National Oil Reserve Base Co., Ltd.
|
16×100 thousand m3
crude oil reserve tank and foundation work of oil
tank, processing pipeline, fire-fighting facilities,
wastewater treatment system, oil transfer pump
station, measuring station, automatic control,
transformer station, switch room and assistant
facilities such as power supply and lighting,
multiple-use building, base communication and
heating. |
From June of 2005 to October of 2007 |